Product Overview
The Six-Sided Steel Encapsulated Calcium Sulphate Raised Floor is fully enclosed with hot-dip galvanized steel sheets on all six sides.
The top and bottom steel plates are pressed and riveted, while the core is made of high-strength calcium sulphate, ensuring excellent structural strength while enhancing environmental sustainability.
Floor System
Each panel is designed with corner locking holes at all four corners, allowing installation using pedestals only, without the need for stringers.
Panels are placed directly onto the pedestals and securely fixed with screws.
This corner-lock system creates a stringerless raised floor structure, capable of supporting both static and dynamic loads commonly required in standard office environments.
Applications
Office buildings
Communication rooms
Power stations
Factory clean rooms
Areas with high requirements for integrated cabling and cable management
Product Features
Excellent fire resistance, A-class fire rating
Eco-friendly and recyclable materials
Outstanding load-bearing capacity
Fully encapsulated steel shell provides excellent sealing and water resistance
High dimensional accuracy for precise installation
FAQ
Q: How long is the delivery time?
A: It depends on the order quantity. Normally, the goods can be loaded into containers and shipped within 5–15 days.
Q: How do you ensure product quality?
A: As a professional raised floor manufacturer, we have a dedicated quality control team responsible for monitoring every production stage, including raw material inspection, manufacturing processes, testing results, and continuous improvement.
Q: What are your payment terms?
A: We usually operate on payment before shipment.
Q: Can you provide samples?
A: Yes, samples are available, but freight costs are not included.



